[Return]
Posting mode: Reply

Do not post anything illegal, dangerous, derogatory, dishonest, malicious, sexually explicit, or dealing with child exploitation. See Terms and Conditions.

  • Supported file types are JPG, PNG and GIF.
  • Images greater than 250x250 will be thumbnailed.

File: 1613809387555.png–(224.74KB, 1005x839, Screenshot_2021-02-20_03-19-49.png)
73
No.73
Given the emergency nature of the expected load stress, the responsibility of ERCOT to ensure maximum reliability on its system, and the ability of ERCOT to identify and dispatch generation necessary to meet the additional load, I have determined that additional dispatch of the Specified Resources is necessary to best meet the emergency and serve the public interest for purposes of FPA section 202(c). Because the additional generation may result in a conflict with environmental standards and requirements, I am authorizing only the necessary additional generation, with reporting requirements as described below.FPA section 202(c)(2) requires the Secretary of Energy to ensure that any 202(c) order that may result in a conflict with a requirement of any environmental law be limited to the “hours necessary to meet the emergency and serve the public interest, and, to the maximum extent practicable,” be consistent with any applicable environmental law and minimize any adverse environmental impacts. ERCOT anticipates that this Order may result in exceedance of emissions of sulfur dioxide, nitrogen oxide, mercury, and carbon monoxide emissions, as well as wastewater release limits. To minimize adverse environmental impacts, this Order limits operation of dispatched units to the times and within the parameters determined by ERCOT for reliability purposes.Based on my determination of an emergency set forth above, I hereby order:A. From February 14, to February 19, 2021, in the event that ERCOT determines that generation from the Specified Resources is necessary to meet the electricity demand that ERCOT anticipates in Texas during this event, I direct ERCOT to dispatch such unit or units and to order their operation only as needed to maintain the reliability of the power grid in the ERCOT region when the demand on the ERCOT system exceeds expected energy and reserve requirements.

https://www.energy.gov/sites/prod/files/2021/02/f82/DOE%20202%28c%29%20Emergency%20Order%20-%20ERCOT%2002.14.2021.pdf
¨ No.74
>Because the additional generation may result in a conflict with environmental standards and requirements, I am authorizing only the necessary additional generation, with reporting requirements as described below.
¨ No.75
Heh, Alex Jones found out about this and is on a RANT!
https://banned.video/watch?id=603046dab342f80fd861fff6

Delete Post